Try Before You Buy

Download a free sample of any of our exam questions and answers

  • 24/7 customer support, Secure shopping site
  • Free One year updates to match real exam scenarios
  • If you failed your exam after buying our products we will refund the full amount back to you.

[Q107-Q128] SAP C_SM100_7210 Practice Verified Answers - Pass Your Exams For Sure! [2021]

Share

SAP C_SM100_7210 Practice Verified Answers - Pass Your Exams For Sure! [2021]

Valid Way To Pass SAP Certified Technology Associate's  C_SM100_7210 Exam


SAP SM Certification Exam Details:

Exam CodeC_SM100_7210
Duration90 mins
LevelAssociate
Exam Price$550 (USD)
Passing ScoreC_SM100_7210 - 65%
Sample QuestionsSAP SM Certification Sample Questions
Number of Questions40
Exam NameSAP Certified Technology Associate - SAP Solution Manager Mandatory and Managed System Configuration (7.2 SPS10)
Reference BooksSM100 (SAP SOLUTION MANAGER 7.2 SP10)
Schedule ExamSAP Training

NEW QUESTION 107
It is the phase for implementation roadmap where you provide initial planning and preparation for your SAP project. Activities include general project management requirements, issuesmanagement plan, organizational change management plan and establishment of other policies and procedures for running the project.
Please choose the correct answer.
Response:

  • A. Final Preparation
  • B. Business Blueprint
  • C. Project Preparation
  • D. Go Live and Support
  • E. Realization

Answer: C

 

NEW QUESTION 108
Select the benefits of sap solution manager from the list items below: (Choose three)

  • A. Integration of sap solutions
  • B. Separation of sap solutions
  • C. Faster ROI
  • D. Reduced cost of operations.
  • E. Lower ROI

Answer: A,C,D

 

NEW QUESTION 109
It is the underlying technology for almost all mySAP.com solutions.

  • A. Business process repository
  • B. Change request management
  • C. Web application server
  • D. Solution manager diagnostics
  • E. Implementation guide

Answer: C

 

NEW QUESTION 110
Benefits of SAP Solution Manager- Central System Administration: (Choose three)

  • A. Time savings due to central access to administered systems
  • B. Improve quality of services
  • C. Automated support of periodic and sporadic administration tasks
  • D. Automatic logging of activities

Answer: A,C,D

 

NEW QUESTION 111
It is being said that you can configure your system manually also in the Basic Configuration. Then there are certain basic configuration steps that you need to perform manually.
Although not all of these configuration activities are required for each system type. Tell us which of the following cannot be included in the manual configuration :
There are 2 correct answers to this question.
Response:

  • A. Adjust BI Authorization Concept
  • B. Export Wily Introscope Agent
  • C. Connect Productive SLD
  • D. Deactivate BI Source System

Answer: A,B

 

NEW QUESTION 112
The features of service desk are as follows: (Select all that apply)

  • A. Message Handling Process
  • B. Solution Manager Diagnostics
  • C. Managing Sap Notes
  • D. Customer Solution Database

Answer: A,B,C,D

 

NEW QUESTION 113
It is a central repository for components SAP Solutions Manager's solution.

  • A. Change request management
  • B. Business process repository
  • C. Solution manager diagnostics
  • D. Web application server
  • E. Implementation guide

Answer: B

 

NEW QUESTION 114
Which standard out of the box tool is used to create your own dashboard within the SAP Solution Manager?

  • A. Management Dashboard Tool
  • B. Focused Build
  • C. SAP KI Catalog
  • D. Dashboard builder

Answer: D

 

NEW QUESTION 115
SAP Solution Manager is developed in the form of add-on components. The software component is also specified as the leading software component.
Software component ST is released not in conjunction with one of the following software components for SAP Solution Manager:
Please choose the correct answer.
Response:

  • A. SAP Solution Manager Imagination Content (ST-ICO)
  • B. Service Tools for Applications: (ST-A/PI) & SAP Solution Manager Services(ST-SER)
  • C. SAP Solution Manager Implementation Content (ST-ICO)
  • D. SAP Solution Tools Plug-In(ST-PI) & Project Suite (CPRXRPM)

Answer: D

 

NEW QUESTION 116
A type of reporting that is designed as a periodic Management Report evaluating different areas of Solution Monitoring.
The goal is to support responsible managers in detecting severe issues and take appropriate, corrective actions. It acts as a interface between your IT department and the person responsible for a business process.
It provides analyses across the systems and business processes in your solution landscape. You can thus react quickly to risks, and continually improve your IT service.
Can you suggest the name of type of reporting:
Please choose the correct answer.
Response:

  • A. Station Reporting
  • B. Static Reporting
  • C. Service Level Reporting (SLR)
  • D. System Reporting

Answer: C

 

NEW QUESTION 117
How can monitoirng objects for job monitoring be created? Note: There are 3 correct answers to this question.

  • A. After assigning systems, logical components, or a Solutions to monitor in the job management group.
  • B. After configuring the self-Monitoring functionality in the SAP Solution manager Administration group.
  • C. After configuring Business Process Monitoring for an existing Solutions in the Business process monitoring gorup.
  • D. After configuring the IT calandar for Technical scenarios in the Technical administration group.
  • E. After creating a technical scenario containing the technical systems to monitor in the Technical monitoring group.

Answer: A,C,E

 

NEW QUESTION 118
Which tool is provided in Job Management for optimizing the background job Schedule?

  • A. Health check
  • B. System Recommendations
  • C. Service Level Reporting
  • D. IT Calendar

Answer: A

 

NEW QUESTION 119
Best practices documents are another valuable content, which is integrated into the SAP Solution Manager

  • A. Incorrect
  • B. Correct

Answer: B

 

NEW QUESTION 120
SAP Solution Manager provides roadmaps that guide you through the complete project.

  • A. Incorrect
  • B. Correct

Answer: B

 

NEW QUESTION 121
Implementation and Distribution manages the Implementation of new or additional scenarios in general.

  • A. Incorrect
  • B. Correct

Answer: A

 

NEW QUESTION 122
Which statements are correct in ref. to the responsible of PM using SolMan: (Choose four)

  • A. Developing strategies and procedures for an efficient SAP implementation
  • B. Giving daily updates on the technical direction of the project including communicating deviations in the project
  • C. Representing the project internally and externally
  • D. Organizing the entire project
  • E. Configuring the software to suit the required business processes and to meet analysis and report requirements
  • F. Finalizing and managing the project scope, budget and deadlines in accordance with the approved plans

Answer: A,C,D,F

 

NEW QUESTION 123
Indentify the four main types of roadmaps reviewed. (Choose four)

  • A. Upgrade roadmap
  • B. Global template roadmap
  • C. Download roadmap
  • D. Implementation roadmap
  • E. Solution roadmap
  • F. Solution management roadmap

Answer: A,B,D,F

 

NEW QUESTION 124
It is a component SAP Solutions Manager used to monitor Java-based components.

  • A. Business process repository
  • B. Change request management
  • C. Solution manager diagnostics
  • D. Web application server
  • E. Implementation guide

Answer: C

 

NEW QUESTION 125
SAP Solution Manager, enterprise edition, is the customer's platform for Application management and SAP Enterprise Support.
The capabilities in the SAP Solution Manager system fully meet all of the phases of Application Lifecycle Management. All incident and problem information can be located within the Solution Manager system.
There is built-in transparency and integration with the Service Desk as a common platform of all issue- related activities that are integrated with following except:
Please choose the correct answer.
Response:

  • A. Test Workbench and
  • B. Charge Management
  • C. System Monitoring and Business Process Monitoring
  • D. Issue Management and Blueprinting

Answer: D

 

NEW QUESTION 126
Suppose if you wish to have the Installation check for configuration step in the basic configuration you have to provide information about your BW configuration.
Which of the statements are correct :
There are 3 correct answers to this question.
Response:

  • A. Let the system create the default users and generate a password, you cannot specify a password or specify an existing user and password.
  • B. Solution Manager and BW are in different systems
  • C. Please keep in mind that the root cause analysis only works if your (separate) BW system is not available.
  • D. Solution Manager client and BW client are the same (in the same system).
  • E. Solution Manager and BW use different clients in the same system

Answer: B,C,E

 

NEW QUESTION 127
Following are the various steps that will direct you to the Service Assistant screen for setting up Service Level Reporting except:
Please choose the correct answer.
Response:

  • A. The top-right pane provides some information on the current check selected in the tree structure in the left pane.
  • B. The lower-left pane contains the data to be maintained within the check selected in the tree structure in the right pane
  • C. The tree structure in the left pane displays the individual checks to be performed in sequence to complete setup of a Service Level Reporting session. Initially, only one check will be present.
  • D. The lower-right pane contains the data to be maintained within the check selected in the tree structure in the left pane.

Answer: D

 

NEW QUESTION 128
......

SAP C_SM100_7210 Pre-Exam Practice Tests | ValidExam: https://www.validexam.com/C_SM100_7210-latest-dumps.html

C_SM100_7210 practice test questions, answers, explanations: https://drive.google.com/open?id=1UoQ7lm92hw0He9wXTenAIizKS1-_LLWf