
Pass C_TS422_1909 Exam in First Attempt Guaranteed 2021 Dumps!
C_TS422_1909 Dumps Full Questions - Exam Study Guide
NEW QUESTION 10
You want to create a production order from a planned order. What methods could you use? Note: There are 2 correct answers to this question.
- A. Partial conversion
- B. Order release
- C. Individual conversion
- D. Full conversion
Answer: A,D
NEW QUESTION 11
The material master of your finished product contains MRP type "PD". You set a manual firming date in the stock requirements list. Which of the following will firm planned orders" There are 2 correct answers to this question.
Response:
- A. Assigning a production scheduling profile
- B. Setting a planning time fence in the Material Master Record
- C. Creating a planned order within the planning time fence
- D. Manually changing the quantity of a planned order
Answer: B,C
NEW QUESTION 12
How can you limit the number of master data objects to be created when the manufacturing process is the same for many different products?
Please choose the correct answer.
Response:
- A. By creating routings with alternative sequences
- B. By assigning different materials to the same routing
- C. By assigning the same production version to different materials
- D. By creating routings with parallel sequences
Answer: B
NEW QUESTION 13
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.
- A. Supply Chain Management (SCM)
- B. Material Requirements Planning (MRP)
- C. Capacity Requirements Planning (CRP)
- D. Integrated Business Planning (IBP)
Answer: A,D
NEW QUESTION 14
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. By period
- B. By material type
- C. By industry
- D. By plant
Answer: A,D
NEW QUESTION 15
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Work center capacities chart
- B. Order (pool) chart
- C. Capacity requirements chart
- D. Orders (dispatched) chart
Answer: A,C
NEW QUESTION 16
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?
- A. Use the minimum order quantity.
- B. Use the MRP type for vendor managed inventory.
- C. Use the fixed lot size procedure.
- D. Use the reorder point.
Answer: C
NEW QUESTION 17
In which material master views can you select the batch management checkbox?
There are 2 correct answers to this question.
Response:
- A. Basic Data 1
- B. MRP 4
- C. Work Scheduling
- D. Purchasing
Answer: C,D
NEW QUESTION 18
When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default?
There are 2 correct answers to this question.
Response:
- A. Staging of components for the next order in the sequence
- B. Posting of production costs to cost collector
- C. Reduction of the capacity requirements
- D. Archiving of backflush documents
Answer: B,D
NEW QUESTION 19
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.
- A. Posting of goods receipt for the product
- B. Posting of production costs to the production cost collector
- C. Archiving of documents for assembly scrap
- D. Material staging for next order in sequence
- E. Reduction of associated capacity requirements
Answer: A,B,E
NEW QUESTION 20
In a first step you have created master recipes. In which sequence are the additional objects created?
Please choose the correct answer.
Response:
- A. Process message
Control recipe
Process order
Process message
PI sheet - B. Process order
Control recipe
Process message
PI sheet - C. Process order
Control recipe
PI sheet
Process message - D. Control recipe
Process order
PI sheet
Answer: C
NEW QUESTION 21
How can you set up the supply source for the SAP Kanban process? Note: There are 3 correct answers to this question.
- A. Using quotations for internal and external procurement
- B. Using purchase orders for external procurement
- C. Using run schedule quantities for in-house production
- D. Using stock transfer reservations for stock transfer
- E. Using purchasing costs for automated source prioritization
Answer: B,C,D
NEW QUESTION 22
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?
- A. Squeezing
- B. Find Slot
- C. Scheduling working time only
- D. Insert operation
Answer: B
NEW QUESTION 23
When can the material availability check occur automatically in a production order? Note: There are 2 correct answers to this question.
- A. At order release
- B. At order confirmation
- C. At order creation
- D. At order settlement
Answer: A,C
NEW QUESTION 24
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. Run PP/DS heuristics for repetitive manufacturing.
- B. Run MRP with quota arrangement.
- C. Run MRP with automatic selection of production version.
- D. Assign planned orders manual lying the planning table.
Answer: A,B
NEW QUESTION 25
What determines whether the planned independent requirements in MRP consume other requirements?
- A. Requirements type
- B. Consumption sequence procedure
- C. Requirements profile
- D. Order type
Answer: A
NEW QUESTION 26
......
SAP Certified Application Associate Free Certification Exam Material from ValidExam with 91 Questions: https://www.validexam.com/C_TS422_1909-latest-dumps.html