NEW QUESTION 88
A system was designed with 3 capacitors. When the system is first activated all capacitors are operating. The system continues to operate as long as at least 1 capacitor is operating. This is an example of
- A. An active parallel system.
- B. A series system.
- C. A standby parallel system.
- D. Redundancy.
Answer: A
NEW QUESTION 89
The critical value of the t-distribution is
- A. Always less than the critical value of the normal distribution.
- B. Always greater than the critical value of the normal distribution.
- C. Approaches the critical value of the normal distribution as the degrees of freedom increase.
- D. Not related to the critical value of the normal distribution.
Answer: C
NEW QUESTION 90
Given that the population standard deviation is 6.8, what sample size is required to be 90% confident that the estimated mean has an error less than 0.02?
- A. 152,083
- B. 312,761
- C. 175,987
- D. 189,859
Answer: B
NEW QUESTION 91
A lot is known to be 1.2% defective. Five units are randomly selected from the lot, and the lot is accepted if
1 or fewer defects are found. What is the probability of the lot being rejected?
- A. 0.9985
- B. 0.01
- C. 0.00173
- D. 0.00223
Answer: C
NEW QUESTION 92
Which of the following is the BEST statement to make regarding the relationship between product precision and product production?
- A. With too much precision, production costs increase.
- B. Precision costs and performance are related.
- C. With too little precision, production costs increase.
- D. With little precision, performance will improve.
Answer: B
NEW QUESTION 93
What distribution is used to determine the OC curve for an attributes sampling plan?
- A. Normal.
- B. Binomial.
- C. The binomial or the hypergeometric distribution.
- D. Exponential.
Answer: C
NEW QUESTION 94
Which of the following are TRUE statements regarding the use of visual inspection?
. Reference standards can be used.
. It provides consistency between inspectors.
. It is relatively expensive.
. It can be quickly performed.
- A. I andIVonly
- B. I,IIandIVonly
- C. I,II,IIIandIV
- D. IIandIVonly
Answer: A
NEW QUESTION 95
What does a corrective action do to prevent an existing noncomformity, defect or undesirable situation from recurring?
- A. Takes repercussions against those responsible.
- B. Eliminates it.
- C. Minimizes it.
- D. Takes action against it.
Answer: B
NEW QUESTION 96
Which of the following nondestructive testing methods can be used to evaluate sub-surface discontinuities in aluminum bar stock?
I. Microwave.
II. Magnetic particle.
III. Pulse echo.
IV. Eddy current.
- A. I and IV only
- B. III and IV only
- C. I, II and IV only
- D. I and III only
Answer: B
NEW QUESTION 97
Maintainability is
- A. The probability of a system being restored to functional operation within a given period of time.
- B. Probability of survival of a system for a given period of time.
- C. Performing adequate maintenance on a system.
- D. Maintaining a machine in satisfactory working condition.
Answer: A
NEW QUESTION 98
Which of the following distributions have the set of all real numbers as their domain?
- A. Exponential
- B. Weibull
- C. None of the above.
- D. Lognormal
Answer: C
NEW QUESTION 99
Which of the following are likely to be positive actions in obtaining a supplier's commitment to quality improvement?
. Involving the supplier early in the product development stage. . Partially reimbursing the supplier, when the product is rejected. . Establishing a firm schedule of required product quantities and dates. . Providing meaningful and timely quality performance feedback.
- A. I,IIIandIVonly
- B. I,IIandIVonly
- C. IandIVonly
- D. I,II,IIIandIV
Answer: A
NEW QUESTION 100
When requesting "worst case" design analysis, you expect the reliability group to
- A. Analyze the worst rejects.
- B. Analyze only those products failing to meet specification requirements.
- C. Determine whether product requirements can be met with subassemblies assumed at their worst combination of tolerances.
- D. Assume all subassembly tolerances at their maximum limit.
Answer: C
NEW QUESTION 101
Which of the following problem-solving tools is a column graph which displays a static picture of the process?
- A. Histogram.
- B. Pareto chart.
- C. Cause and effect diagram.
- D. Control chart.
Answer: A
NEW QUESTION 102
The Shewhart or Deming cycle is often referred to as
- A. Plan-do-check-act.
- B. The cause and effect diagram.
- C. The affinity diagram.
- D. Problem solving flow chart.
Answer: A
NEW QUESTION 103
Reliability prediction is
I. The process of performance estimation.
II. The process of estimating the probability that a product will perform its intended function for a stated time.
III. The process of telling "how you can get there from here".
- A. II and III only
- B. I only
- C. II only
- D. I, II and III
Answer: C
NEW QUESTION 104
The AQL for a given sampling plan is 1% this means that
- A. The average quality level of the plan is 1%.
- B. All accepted lots are 1% defective or better.
- C. The producer takes a small risk of rejecting product which is 1% defective or better.
- D. All lots are 1% defective or better.
Answer: C
NEW QUESTION 105
What order do the following corrective action steps normally take for nonconforming product?
I. Analyze the problem.
II. Assign responsibility.
III. Take preventive action.
IV. Evaluate potential importance.
V. Investigate possible causes.
- A. II, IV, V, I, III
- B. I, II, V, IV, III
- C. V, II, IV, I, III
- D. II, I, IV, V, III
Answer: A
NEW QUESTION 106
Which of the following would be considered the WEAKEST reason to initiate an audit?
- A. Follow-up on corrective action.
- B. To compare actual practice to a defined standard.
- C. Identify the root cause of a recent problem.
- D. Verify that a quality system continues to meet requirements.
Answer: C
NEW QUESTION 107
Which of the following quality gurus was very critical of merit-pay and individual bonuses?
He discouraged management by objectives and the ranking of employees by performance.
- A. Dr. Feigenbaum
- B. Dr. Taguchi
- C. Dr. Deming
- D. Dr. Juran
Answer: C
NEW QUESTION 108
In nonparametric statistics:
. No assumptions are made concerning the distribution from which the samples are taken.
. The parameters of the distribution do not relate to the parameters of the sample.
. The sample and the distribution must have no parameters in common.
- A. I only
- B. IIonly
- C. IIandIIIonly
- D. IIIonly
Answer: A
NEW QUESTION 109
Given the data below, what is the 90% confidence interval for the variance?
22, 23, 19, 17, 29, 25
- A. 4.21 - 99.07
- B. 16.87 - 56.52
- C. 8.27 - 79.88
- D. 15.32 - 28.66
Answer: C
NEW QUESTION 110
The value for t, when making a two-tailed paired t test, with samples of 13 and alpha =0.05, is
- A. 2.179
- B. 1.782
- C. 1.711
- D. 2.064
Answer: A
NEW QUESTION 111
When requesting "worst case" design analysis, you expect the reliability group to
- A. Analyze the worst rejects.
- B. Analyze only those products failing to meet specification requirements.
- C. Determine whether product requirements can be met with subassemblies assumed at their worstcombination of tolerances.
- D. Assume all subassembly tolerances at their maximum limit.
Answer: C
NEW QUESTION 112
An X-bar and R chart with n=5 has been plotted for some time and has demonstrated random variation.
Upon review of the last 30 plot points, the expected number of runs around the centerline on the X-bar chart is expected to be approximately which of the following?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: B
NEW QUESTION 113
......
Give push to your success with CQE exam questions: https://www.validexam.com/CQE-latest-dumps.html
CQE 100% Guarantee Download CQE Exam PDF Q&A: https://drive.google.com/open?id=1YmGJLLb0vKXhM8R1jzODs9QOxnoWR0UR