(PDF) HPE Technical HPE0-S59 Exam and Certification Test Engine
Use HPE0-S59 Exam Dumps (2024 PDF Dumps) To Have Reliable HPE0-S59 Test Engine
NEW QUESTION # 18
What is a restriction of using a RoCE network?
- A. it is not supported with HPE Virtual Connect SE 40 GD F8 Module for HPE Synergy.
- B. It does not support smart link and private network features.
- C. It does not support Private VLAN and Multicast VLAN.
- D. It is by default configured as an untagged network and cannot be a part of a network set.
Answer: D
NEW QUESTION # 19
Your customer plans to deploy VMware ESXi 7 0 U2 and they are looking for a hardware platform mat wilt allow them to use up to 24 TB of physical memory.
Which HPE compute system meets this customer's requirements?
- A. HPE ProLiant DL380 Gen 10 Plus
- B. HPE Synergy 480 Gen10 Plus
- C. HPE ProLiant DL560 Gen10
- D. HPE Superdome Flex 280
Answer: A
NEW QUESTION # 20
Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They plan to use Distributed Switches and DRS cluster You are preparing a proposal with the following components:
- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- an appropriate number of the vSphere Standard licenses for each compute node
- one HPE D3940 Storage Modules with 40 SSDs - all required cables and options Which statement about this proposal is true?
- A. 20 SSD drives should be removed from this setup, as D3940 supports only 20 SSD or SAS drive.
- B. 2 additional HPE Synergy 480 Gen10 Plus compute modules can be added to this setup
- C. One HPE Virtual Connect SE 100Gb F32 Module for Synergy should be replaced with 50GD/S ILM
- D. vSphere Standard licenses should be replaced with Enterprise Pius licenses to enable requested features
Answer: D
NEW QUESTION # 21
Your customer is implementing an HPE Synergy solution based on three frames.
Click each of the ports that can be used to connect satellite modules.
Answer:
Explanation:
NEW QUESTION # 22
Which statement about HPE Apollo 2000 Gen10 Plus platform is true?
- A. It can support a single processor only and up to 4 per chassis
- B. It offers servers with AMD EPYC and Intel Xeon Scalable CPUs
- C. It is fully managed using HPE OneView including all connections
- D. It is equipped with HPE Persistent memory by default
Answer: A
NEW QUESTION # 23
Click the area within the iLO management interface that will allow you to access workload Advisor.
Answer:
Explanation:
NEW QUESTION # 24
Your customer has the following HPE Synergy setup
- 3 HPE Synergy 12000 Frames
- 4 HPE Virtual Connect SE 100 Gb F32 Modules
- 2 HPE Synergy 50 GO Interconnect Link Modules
- 36 HPE Synergy 480 Gen10 Plus compute modules
- 2 HPE Composer 2 modules
Which statement about this setup is true?
- A. The customer can add one D3940 storage Module to each of the frames
- B. To manage all frames, the customer must buy two additional HPE Composer 2 modules
- C. The customer must buy 36 HPE OneView Advanced licenses to manage compute modules
- D. To use all compute nodes, the customer must create at least two logical enclosures
Answer: C
NEW QUESTION # 25
Your customer wants to add dedicated Fibre Channel connectivity to the HPE Synergy frame running HPE Synergy 480 Gen10 compute modules, each with one CPU socket populated Currently they use two 12 Gb SAS switches and two HPE Virtual Connect SE 100Gb F32 Modules for HPE Synergy installed in third fabric.
What must be done to enable dedicated FC connectivity for this HPE Synergy frame?
- A. SAS switches must be moved to second fabric and FC modules Installed in the first one.
- B. For VC-FC modules, all of server facing ports must be property licensed.
- C. For Brocade switches, a logical interconnect group must be created in HPE OneView.
- D. A second CPU must be installed for all HPE Synergy 480 Gen10 compute nodes.
Answer: A
NEW QUESTION # 26
An administrator tries to open iLO interlace from HPE OneView Instead of being automatically logged in a login prompt displays Where should you start the troubleshooting process?
- A. At HPE OneView Interface to verify whether the server is In the maintenance mode
- B. At HPE OneView Interface to verify whether the iLO processor is disabled
- C. At the iLO interface to verify whether the SSO certificate is removed from an iLO.
- D. At the iLO interface to verify whether the ILO Advanced license is properly applied
Answer: D
NEW QUESTION # 27
What is a limitation when creating a server profile?
- A. BIOS settings can be changed only when UEFI optimized is selected as boot mode
- B. ILO management is limited to the integration with Active Directory or LDAP
- C. Administrator cannot define more than 8 connections within a server profile
- D. It is not possible to create shared volumes on demand through a server profile
Answer: B
NEW QUESTION # 28
Your customer plans to deploy HPE OneView for VMware vCenter Server together with HPE Storage Integration Pack for VMware vCenter. The customer wants to use them to manage HPE Synergy Gen10 compute modules. HPE ProLiant Gen 10 servers and an MSA array.
Which statement about compatibility of the existing environment with the planned software components is true?
- A. HPE OneView for VMware vCenter Server does not support standalone HPE ProLiant servers
- B. Both HPE Synergy Gen10 full-height compute module plugins will require a license
- C. To use the required plugins HPE ProLiant Gen10 systems must be managed using HPE OneView
- D. HPE Storage integration Pack for VMware vCenter does not support MSA arrays
Answer: A
NEW QUESTION # 29
Which statement about a new HPE SimpliVity deployment is true?
- A. New HPE SimpliVity deployments are licensed per node not per physical socket
- B. All new HPE SimpliVity models support deduplication and compression
- C. New HPE SimpliVity deployments give customer flexible choice of hypervisor
- D. All new HPE SimpliVity models are based on AMD CPUs
Answer: B
NEW QUESTION # 30
Your customer plans to deploy ESXi systems to HPE Synergy and HPE ProLiant servers using HPE OneView for VMware vCenter Server.
Which statement about HPE OneView for VMware vCenter Server functionality is true for this environment?
- A. HPE ProLiant servers need an HPE OneView for VMware vCenter Server license for full functionality
- B. HPE Synergy requires HPE Composer 2 for full functionality of HPE OneView for VMware vCenter Server
- C. Individual systems can be added to HPE OneView for VMware vCenter Server through an ILO management processor
- D. Only systems managed using HPE Oneview can use HPE Oneview for VMware vCenter Server functionalities
Answer: A
NEW QUESTION # 31
Your customer plans to deploy VMware ESXi 7. 0 U2, and they are looking for a hardware platform that will allow them to use up to 16 CPU sockets Which HPE compute system meets the customer requirements?
- A. HPE Superdome Flex system
- B. HPE ProLiant DL580 Gen10
- C. HPE ProLiant OL380 Gen 10 Plus
- D. HPE Synergy 480 Gen10 Plus
Answer: D
NEW QUESTION # 32
Refer to the exhibit.
Which statement about this logical interconnect group is true?
- A. For the given downlink speed, the maximum number of frames is reached
- B. The master modules are located in the interconnect bays 2 and 5
- C. Both master modules are located in the same HPE S ynergy frame
- D. To use interconnect bay set 3, all compute nodes must be half-height
Answer: C
NEW QUESTION # 33
Your customer added a new Ethernet network in HPE Oneview mat is used to manage their HPE Synergy platform.
When the customer tries to connect one of the compute nodes to this network through the server profile, this network is not available.
What must be done to fix this issue?
- A. To make this network available to use in the server profile, the customer must enable the Smart Link feature within network definition.
- B. The newly created network must be added to the uplink set within the LIG, and Logical interconnect configuration must be updated from the LIG.
- C. Check within the server profile which server hardware is used and perform the Refresh operation on this compute node to get the latest adapter information.
- D. Check the Logical Enclosure settings and verify if the maximum number of networks allowed for this LE is reached.
Answer: B
NEW QUESTION # 34
Refer to the exhibit.
Which statement about this logical JBOD is true?
- A. After deleting this logical JBOD, its drives w not be available until a clean-up procedure 6 done
- B. This logical JBOD can be presented to the compute nodes in a different frame.
- C. After deleting this logical JBOD drives will he blocked for 12h m case this JBOD must be re-created
- D. This logical JBOD can be connected to multiple systems to formulate a snared datastore.
Answer: A
NEW QUESTION # 35
......
HPE0-S59 Dumps Full Questions with Free PDF Questions to Pass: https://www.validexam.com/HPE0-S59-latest-dumps.html
HPE0-S59 PDF Recently Updated Questions Dumps to Improve Exam Score: https://drive.google.com/open?id=1l2F-QEdGGoqNOAoaNF0cyEBjXQf29Kue