NEW QUESTION # 26
The Work Center provides default values for the routing.Which of these default values is a mandatory entry if an operation is created in the routing?

  • A. Control key
  • B. Work Center
  • C. Standard value key
  • D. Standard text key

Answer: A


NEW QUESTION # 27
What kind of reports does the classification area offer?Note: There are 3 correct Answers to this question.

  • A. Object list
  • B. Class status
  • C. Characteristics list
  • D. Summarized class explosion
  • E. Classification status

Answer: A,C,E


NEW QUESTION # 28
Where can you create routings?Note: There are 3 correct Answers to this question.

  • A. In the classic transaction or corresponding Fiori app for the creation of routings (CA01)
  • B. In Visual Manufacturing Planner
  • C. In Product Structure Synchronization
  • D. In the classic transaction or corresponding Fiori app for the Engineering Workbench (CEWB)
  • E. In the classic transaction or corresponding Fiori app for Variant Configuration Modeling Environment (PMEVC)

Answer: A,B,D


NEW QUESTION # 29
You work with cross-plant and plant-specific Product Master statuses. Which status has the highest priority?

  • A. The least restrictive status.
  • B. The plant-plant specific status.
  • C. The cross-plant status.
  • D. The most restrictive status.

Answer: C


NEW QUESTION # 30
What should be taken into account for names of characteristics?Note: There are 3 correct Answers to this question.

  • A. The name must start with a letter and must be assigned externally.
  • B. You can change the name at any time later.
  • C. The following are allowed: Letters, figures, underscore, and hyphen.
  • D. If the name contains a hyphen, a keyword SKEY is required in the syntax of object dependencies.
  • E. The name is purely numeric and must be assigned internally.

Answer: A,C,D


NEW QUESTION # 31
A procedure sets the value V2 for characteristic C2 when the value V1 is set for characteristic C1.How do you assign and define this procedure?Note: There are 3 correct Answers to this question.

  • A. Procedure to the value V1 with the following syntax: $self.C2 = 'V2' (not recommended)
  • B. Procedure to the value V2 with the following syntax: $self.C1 = 'V1' (not recommended)
  • C. Procedure to characteristic C1 using the following syntax: $self.C2 = 'V2' if $self.C1 = 'V1' (not recommended)
  • D. Procedure to characteristic C2 using the following syntax: $self.C1 = 'V1' if $self.C2 = 'V2' (not recommended)
  • E. Procedure with the following syntax to the configuration profile: $self.C2 = 'V2' if $self.C1 = 'V1' (recommended)

Answer: A,C,E


NEW QUESTION # 32
Some of your classifications are locked or incomplete. How do you find them?Note: There are 2 correct Answers to this question.

  • A. Use Find in Classes and filter the search result.
  • B. Use the Class list.
  • C. Use the Classification status.
  • D. Use the Characteristics list.

Answer: A,C


NEW QUESTION # 33
What do you have to keep in mind when copying a group BOM to a plant specific BOM?Note: There are
2 correct Answers to this question.

  • A. The internal BOM number stays unchanged.
  • B. The material component must have a plant assignment.
  • C. The BOM usage can be changed.
  • D. The header status has to be active.

Answer: A,B


NEW QUESTION # 34
Which routing objects can object dependencies be assigned to?Note: There are 3 correct Answers to this question.

  • A. Production Resource Tools
  • B. Operations
  • C. Inspection Characteristics
  • D. Component Allocation
  • E. Sequences

Answer: A,B,E


NEW QUESTION # 35
You activate the check for same classification inside basic data screen of your class. Which restrictions are available?
Note: There are 2 correct Answers to this question.

  • A. The classification is only checked for objects connected to several classes.
  • B. The classification is only checked when you have assigned values to all characteristics.
  • C. The classification is only checked for objects connected to one class.
  • D. The classification is only checked when you have assigned values to some characteristics.

Answer: B,C


NEW QUESTION # 36
Which prerequisites must be fulfilled before a configuration profile can be created and released for a configurable material?

  • A. At least one variant class must be assigned to the configurable material. Values must be assigned to the characteristics here.
  • B. Exactly one variant class must be assigned to the configurable material.
  • C. At least one variant class must be assigned to the configurable material.
  • D. At least one variant class must be assigned to the configurable material. Values must not be assigned to the characteristics here.

Answer: D


NEW QUESTION # 37
You can assign material components to operations.What needs to be taken into account?

  • A. You can only assign material components that have also been assigned to the routing as production resources and tools.
  • B. You can only assign material components that were previously assigned to the header material.
  • C. You can only assign each material component, when the material master exists and is known in the plant.
  • D. You can only assign material components that are components of a material BOM.

Answer: A


NEW QUESTION # 38
What controls the material BOM item category?Note: There are 2 correct Answers to this question.

  • A. A work center is required.
  • B. A change number is required.
  • C. A negative quantity is allowed.
  • D. A material number is required.

Answer: C,D


NEW QUESTION # 39
What happens to the group BOM when you do a plant assignment?

  • A. The internal number and the BOM usage becomes new.
  • B. The internal number stays unchanged and the BOM usage becomes new.
  • C. The internal number becomes new and the BOM usage stays unchanged.
  • D. The internal number and the BOM usage stays unchanged.

Answer: C


NEW QUESTION # 40
You connected characteristics inside one class to organizational areas. What are the benefits?Note:
There are 2 correct Answers to this question.

  • A. Users can only work with characteristics depending on the authorization for a particular organizational area.
  • B. A check for the same classification is only possible inside one organizational area.
  • C. Users can always see all characteristics for all areas.
  • D. A check for the same classification is possible for all organizational areas.

Answer: B,D


NEW QUESTION # 41
To which object of a Task List can you directly assign production resources/tools?

  • A. Sequences
  • B. Operations
  • C. Headers
  • D. Material assignments

Answer: B


NEW QUESTION # 42
Where can you specify a processing sequence during an assignment?

  • A. Procedures
  • B. Pre- and Selection Conditions
  • C. Constraint Nets
  • D. Constraints

Answer: A


NEW QUESTION # 43
What happens if the characteristic status is not set to Released?

  • A. A value of this characteristic cannot be assigned in configuration.
  • B. A value of this characteristic cannot be assigned in classification of a configurable material.
  • C. The characteristic can only be changed.
  • D. The characteristic cannot be assigned to a class.

Answer: A


NEW QUESTION # 44
What information does a change number header include?Note: There are 2 correct Answers to this question.

  • A. Change type
  • B. Parameter effectivities
  • C. Change number status
  • D. Object information

Answer: C,D


NEW QUESTION # 45
In a single-level configuration, you want to use a constraint so that if characteristic C1 has the value V1, then characteristic C2 is assigned the value V2.C1 and C2 are assigned to class (300)T_FCL00.What would be a correct complete constraint?

  • A. RESTRICTION: $self.C2 = 'V2' if $self.C1 = 'V1'
  • B. RESTRICTION: (300)T_FCL00.C2 = 'V2' if (300)T_FCL00.C1 = 'V1'
  • C. RESTRICTION: ?C2 = 'V2' if ?C1 = 'V1'
  • D. RESTRICTION: ?T_FCL00.C2 = 'V2' if ?T_FCL00.C1 = 'V1'

Answer: B


NEW QUESTION # 46
Which features are available when working with the Manage Documents app?Note: There are 2 correct Answers to this question.

  • A. A secure storage area is selected automatically.
  • B. An object link to every SAP Object can be defined.
  • C. All information is displayed on only one page.
  • D. A secure storage area can be selected manually.

Answer: A,C


NEW QUESTION # 47
What do you have to keep in mind when creating a Product Master from scratch?Note: There are 2 correct Answers to this question.

  • A. Only files can be connected and uploaded, no document info records.
  • B. No organizational levels are asked.
  • C. No view selection screen becomes visible.
  • D. An industry sector can be selected.

Answer: B,C


NEW QUESTION # 48
You can use the syntax element $set_pricing_factor for pricing in object dependencies.What do you need to consider?Note: There are 2 correct Answers to this question.

  • A. $set_pricing_factor sets the variant condition and adds a factor to it. The variant condition must not already be assigned.
  • B. Negative factors must not be used in $set_pricing_factor.
  • C. You cannot use zero as a factor in $set_pricing_factor.
  • D. $set_pricing_factor adds only one factor. The variant condition must already be assigned.

Answer: A,C