Try Before You Buy

Download a free sample of any of our exam questions and answers

  • 24/7 customer support, Secure shopping site
  • Free One year updates to match real exam scenarios
  • If you failed your exam after buying our products we will refund the full amount back to you.

E-S4CON-2025 100% Pass Guaranteed Download SAP Certified Specialist Exam PDF Q&A [Q19-Q41]

Share

E-S4CON-2025 100% Pass Guaranteed Download SAP Certified Specialist Exam PDF Q&A

E-S4CON-2025 Practice Test Dumps with 100% Passing Guarantee

NEW QUESTION # 19
What is the minimum SAP BASIS rellease of an SAP ECC system that can be converted t o an SAP S/4HANA Server 2023?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D


NEW QUESTION # 20
You performed a custom code checck for an SAP S/4HANA conversion.
In which transactions can you review the results? Note: There are 2 correct answers to this question.

  • A. SAT(Runtime Analysis)
  • B. SYCM (Simplification Database Content)
  • C. ATC (ABAP Test Cockpit)
  • D. SE80 (Object Navigator)

Answer: C,D


NEW QUESTION # 21
During the upgrade of your developpment system, you run into the adjustment of non-dictionary objects, handled by transaction SPAAU. There you find programs that are shown in statuus "automatic adjustment" (green traffic light).
What will happen with these prograams when you continue with your upgrade without performing any other actions inside your SAP syystem?

  • A. SUM continues with the next phase, and the coding of your modified objects are set to the new SAP standard.
  • B. SUM continues with the next phase and your modifications are kept as in the start release.
  • C. SUM refuses to continue unnless you have marked a transport request as modiffication adjustment transport.
  • D. Before continuing with the next phase, SUM asks for a modification adjustmennt transport.

Answer: D


NEW QUESTION # 22
You are running an SAP ECC system .
For which of the following activitiess does SUM allow you to use the near-Zero Downtimme Maintenance (nZDM) capabilities? Note: There are 3 correct answers to this question.

  • A. Apply SAP Support Packagees.
  • B. Perform an SAP S/4HANA conversion including DMO.
  • C. Perform an SAP S/4HANA conversion without DMO.
  • D. Use DMO for SUM.
  • E. Upgrade the SAP system.

Answer: A,D,E


NEW QUESTION # 23
Which of the following scenarios dooes Software Update Manager cover? Note: There are 2 correct answers to this question

  • A. New Implementation
  • B. Conversion to SAP S/4HANAA Cloud Public Edition
  • C. Conversion to SAP S/4HANAA on-premise
  • D. Conversion to SAP S/4HANAA Cloud Private Edition

Answer: C,D


NEW QUESTION # 24
What do you need to consider when performing the SI checks for an SAP S/4HANA connversion? Note: There are 2 correct answers to this question.

  • A. You need an SAP system baased on AS ABAP 7.52 or above for the SI check frammework.
  • B. The errors from the SI checks must be solved; otherwise, SUM will report an errror.
  • C. You need to build up an SI check framework by applying SAP Notes.
  • D. The Si checks are executed in the development system and the results are trannsported into the subsequent systems.

Answer: B,C


NEW QUESTION # 25
What is the benefit of using the UPGANAXML file from a previous SUM run?

  • A. To repeat specific phases during the SUM run
  • B. To make the progress information within SUM UI more accurate
  • C. To auto-fill specific fields onn selected screens on the SUM UI
  • D. To skip selected phases durring the SUM run

Answer: B


NEW QUESTION # 26
Which step can be optimized when you provide the MIGRATE_DT_DURXML file to SUMM?

  • A. Silent data migration (SDM)
  • B. Downtime conversion
  • C. Downtime migration
  • D. Shadow on target creation

Answer: C


NEW QUESTION # 27
You are executing as SAP S/4HANA Conversion with scenario strategy Standard. When will the shadow instance be stopped for thee last time?

  • A. Early in the downtime
  • B. As part of the cleanup process
  • C. At the end of the downtimee
  • D. Before the downtime startss

Answer: D


NEW QUESTION # 28
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime annd 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE MIG_DT_RUN is running In the Charts Control Center, you can see 400 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?

  • A. These are 40 pairs of R3load processes, so there are 80 R3load processes running
  • B. Without table contents commparison, only 40 R3load processes are being started.
  • C. SUM is still running in uptimme; the 40 defined R3load processes are considered.
  • D. There are 40 R3load processses used for copying and 40 R3load processes for taable count verification.

Answer: A


NEW QUESTION # 29
You are running an SAP ECC system with SAP BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perfform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A.
  • B.
  • C.
  • D.
  • E.

Answer: A,B,C


NEW QUESTION # 30
You are performing an SAP S/4HANA conversion for your production system. This conversion project requires that certain business functtions are switched on. Following SAP recommendatiions, how will you achieve this? Note: There are 2 correct answers to this question.

  • A. During conversion, SUM deelivers some business functions already activated.
  • B. Activate the required business functions in the switch framework from section S/4H_ALWAYS_ON_FUNCTIONS.
  • C. Activate the required business functions manually in the production system.
  • D. Import a transport request from the development system that contains the reccording of the activation.

Answer: A,D


NEW QUESTION # 31
During a SUM run, you want to check if the PARCONV_UPG phase is still running propeerty. Where can you find information about thiss? Note: There are 2 correct answers to this question.

  • A. Check for running R3trans processes on the host where SUM is running
  • B. Check the running batch job via Job Overview (SM37).
  • C. Check for running R3load processes on the host where SUM is running
  • D. Check the latest log files in the SUM directory, subdirectory abap, subdirectoryy tmp.

Answer: B,D


NEW QUESTION # 32
You are performing an SAP S/4HANA conversion, scenario strategy Standard, with DMOO as an inplace migration. How does SUM transfer the data from the source database to the target database during the migration?

  • A. Using R3load and network socket connection
  • B. Using work processes and network socket connection
  • C. Using R3load and file transffer
  • D. Using R3load and memory pipes

Answer: D


NEW QUESTION # 33
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. SAP ECC system from SAP ERP 6.0 EHP 8
  • B. Standalone AS ABAP with SAP BASIS 752
  • C. SAP Solution Manager 7.2
  • D. SAP S/4HANA Server 2022

Answer: B,D


NEW QUESTION # 34
You are planning an SAP S/4HANA conversion.
Which conversion-specific tasks muust be performed during the preparation phase?

  • A. Solve problems from the si mplification item (SI) checks.
  • B. Run the database migrationn to the SAP HANA database.
  • C. Check the compatibility of custom code with SAP S/4HANA.
  • D. Perform the migration of data to the new data structure.

Answer: C


NEW QUESTION # 35
......

E-S4CON-2025 PDF Dumps Are Helpful To produce Your Dreams Correct QA's: https://www.validexam.com/E-S4CON-2025-latest-dumps.html

New E-S4CON-2025 exam Free Sample Questions to Practice: https://drive.google.com/open?id=1MvmpCyaep0q1YpcKDE0wVzSziUcuSckl