Online version enjoys most popularity among IT workers. It can bring you to the atmosphere of CCM valid test and can support any electronic equipment, such as: Windows/Mac/Android/iOS operating systems, which mean that you can practice your CCM (Certified Case Manager Certification Exam (CCM)) exam dumps anytime without limitation. You can make most of your spare time to review your CCM valid vce when you are waiting the bus or your friends. Besides, it doesn't limit the number of installed computers or other equipment.
Our website is a professional certification dumps provider that offer candidates Medical Professional CCM valid vce and CCM exam pdf for achieving success in an effective way in the CCM valid exam. We have a team of rich-experienced certified trainers who did many research in the CCM valid test, they checked the updating everyday to make sure that our candidates get the latest Medical Professional CCM exam dumps and pass the CCM valid exam with high rate. Our website is the best online training tools to find your CCM valid vce and to pass your test smoothly. Our concept is always to provide best quality practice products with best customer service. Choosing ValidExam, choosing success.
High pass rate
According to our customer's feedback, our CCM exam pdf have 85% similarity to the real questions of CCM valid exam. The high accuracy and profession of CCM valid vce ensure everyone pass the exam smoothly. So if you prepare Medical Professional CCM valid test carefully and remember questions and answers of our CCM exam dumps, you will get a high score in the actual test.
About our Medical Professional CCM exam pdf
Our website offers the most reliable and accurate CCM exam dumps for you. All of our CCM exam pdf was written and approved by our certified trainers and IT experts, which make sure the accuracy and high pass rate of CCM valid vce. Besides, our colleagues check the updating of CCM exam pdf everyday to ensure candidates pass the CCM (Certified Case Manager Certification Exam (CCM)) valid test smoothly. Our study materials also contain the CCM practice exam for you to fit the atmosphere of formal test, which enable you to improve your ability with minimum time spent on CCM valid exam and maximum knowledge gained.
One-year free update
If you bought Medical Professional CCM (Certified Case Manager Certification Exam (CCM)) exam pdf from our website, you will be allowed to free update your exam dumps one-year. If there is latest version released, we will send to your email immediately. So you don't need to check the updating of CCM exam dumps every day, you just need to check your email.
Medical Professional Certified Case Manager Certification Exam (CCM) Sample Questions:
1. Regarding the FIDIC Red Book (edition 1999): which two statements are true in respect of Building Information Modelling (BIM)?
Choose all of the correct answers (multiple possibilities).
A) BIM is not related to the improvement of quality, accuracy, delivery times and cost savings.
B) General Conditions of Contract require the use of BIM.
C) BIM is one of the digital data technologies used in all aspects of project planning, investigation, design, construction and operation.
D) For construction or building projects involving BIM, many Sub-Clauses of FIDIC Red Book (edition
2017) should be thoroughly reviewed when drafting the Particular Conditions.
2. A Contractor under the FIDIC Silver Book (edition 1999) has not been able to finish the Works within the Time for Completion as mentioned in the Contract and has overrun the Time for Completion by 3 months.
This results in a significant claim of $4,500,000 from the Employer. The Employer has submitted this claim to the Contractor according to the procedures as mentioned in the Contract. The Contractor asks you for advice and refers to Clause 8. Which one of the following statements is NOT true?
A) If there are Variations agreed between the Contractor and the Employer, the Contractor should check if an adjustment for Time for Completion was part of any of these Variations.
B) In addition to the delay damages as mentioned in Sub-Clause 2.5, the Employer has the right to claim any extra costs it has to make due to the delay, as delay damages are not seen as compensation for costs incurred by the Employer, but only as an incentive for the Contractor to perform on time.
C) If the delay is entirely caused by the Employer having instructed the Contractor to suspend progress during the Works, while the cause of the suspension is not the responsibility of the Contractor, the claim for delay damages was wrongfully issued.
D) The root cause of the delay has to be determined by the Contractor, thereby especially verifying if the cause of the delay lies in a delay caused by the Authorities.
3. Which one of the following statements is correct regarding the Provisional Sum under the FIDIC Red, Yellow, and Silver Books (edition 1999)?
A) Each Provisional Sum shall not be used, in whole or in part, in accordance with instructions from the Engineer.
B) The Contractor shall, when required by the Engineer, produce proof to substantiate how it has used the Provisional Sum.
C) The Provisional Sum cannot be issued by instruction either by the Engineer (or Employer in case of FIDIC Silver Book).
4. Under the FIDIC Red Book (edition 1999), as part of the Contractor submission of Statement, any amount to be deducted for retention, will be calculated by applying the percentage of retention stated in the Appendix to Tender to the total of: (two correct answers apply) Choose all of the correct answers (multiple possibilities).
A) Any amounts to be added and deducted for changes in legislation and changes in cost.
B) Any amounts to be added and/or deducted for the advance payment and repayments under Sub-Clause
14.2.
C) The estimated contract value of the Works executed.
D) Any amounts to be added and deducted for Plant and Materials in accordance with Sub-Clause 14.5.
5. Which one of the following documents constitutes a contract and is considered binding on both parties, when the Employer wants to award the Contract to the tenderer?
A) Letter of Intent & Memorandum of understanding
B) Letter of Intent
C) Memorandum of understanding
D) Letter of Acceptance
Solutions:
Question # 1 Answer: C,D | Question # 2 Answer: B | Question # 3 Answer: B | Question # 4 Answer: C,D | Question # 5 Answer: D |