Our concept is simple: best quality practice products with best customer service. ValidExam's SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing (C_TS422_2504 Deutsch Version) set delivers 89 practice questions for the C_TS422_2504 Deutsch exam plus 24/7 assistance.
SAP C_TS422_2504 Deutsch Exam Overview:
| Certification Vendor: | SAP |
|---|---|
| Exam Name: | SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing |
| Exam Number: | C_TS422_2504 Deutsch |
| Exam Price: | USD 200 |
| Exam Duration: | 180 minutes |
| Exam Format: | Scenario-based questions, Multiple-select, Multiple-choice |
| Passing Score: | 68% |
| Available Languages: | English |
| Real Exam Qty: | 80 |
| Certificate Validity Period: | Typically 1 year (SAP certification validity may vary by release) |
| Related Certifications: | SAP S/4HANA Cloud Private Edition - Manufacturing SAP S/4HANA Cloud Private Edition - Production Planning (PP) |
| Recommended Training: | SAP Learning Hub – Production Planning content SAP S/4HANA Manufacturing (TS422) Learning Journey |
| Exam Registration: | SAP Certification Hub SAP Learning Hub |
| Sample Questions: | ![]() |
| Exam Way: | Online proctored or test center-based exam via SAP Certification Hub |
| Pre Condition: | No formal prerequisites required, but SAP recommends knowledge of manufacturing processes and SAP S/4HANA fundamentals. |
| Official Syllabus URL: | https://learning.sap.com/certifications |
SAP C_TS422_2504 Deutsch Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Demand Management and Master Data | 15% | - Work centers and routing concepts - Material master and BOM structure - Demand management and planned independent requirements (PIR) |
| Topic 2: MRP and Material Flow | 20% | - Stock and requirements list analysis - Lot sizing and procurement proposals - MRP Live and planning runs |
| Topic 3: Introduction to SAP S/4HANA Supply Chain Planning | 10% | - SAP S/4HANA overview and architecture - SAP Fiori user experience fundamentals - Lines of business and digital core concepts |
| Topic 4: Production Execution | 25% | - Production order management - Shop floor execution and confirmations - Capacity planning and scheduling |
| Topic 5: Introduction to Production Planning in SAP S/4HANA | 10% | - Consumption-based planning - Make-to-stock vs make-to-order vs assembly planning - MRP fundamentals and planning strategies |
| Topic 6: Quality, Integration, and Reporting | 20% | - Reporting and analytics in SAP Fiori - Integration with finance and controlling - Batch management and quality processes |
About the SAP C_TS422_2504 Deutsch Exam: FAQ
Delivery is instant: payment triggers an automatic email within a minute — unlimited installations, and 24/7 customer assisting for any downloading or purchasing issue if nothing arrives within 2 hours. If you fail the corresponding C_TS422_2504 Deutsch exam within 60 days of purchase, choose your remedy: a full refund (scanned enrollment slip plus the official Score Report PDF within 2 days of the exam; processed within 7 days), waiting for the next updated version free, or a free change to two other equal-value dumps. Excluded: exams within 3 days of purchase, candidate names that don't match the payer, and free or expired products.
180 minutes for 80 questions. Fit the atmosphere in advance: timed sessions in the ValidExam online engine make the formal pace feel practiced, not pressured.
Use the vendor's official registration channels:
The SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing (C_TS422_2504 Deutsch Version) is delivered Online proctored or test center-based exam via SAP Certification Hub — select whichever arrangement suits you when booking.
The SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing (C_TS422_2504 Deutsch Version) blueprint spans 6 domains — including Quality, Integration, and Reporting (20%), Introduction to Production Planning in SAP S/4HANA (10%), MRP and Material Flow (20%). Let the weightings direct your spare-time review; the full outline above lists every subtopic.
Yes — download the free SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing (C_TS422_2504 Deutsch Version) demo and evaluate the material before paying. Purchases include 365 days of free updates, each new version emailed immediately upon release; renew afterward at 50% off.
No formal prerequisites required, but SAP recommends knowledge of manufacturing processes and SAP S/4HANA fundamentals. Eligibility rules change periodically, so confirm the current requirements on the official page (official C_TS422_2504 Deutsch exam page) before registering.
Yes:
Courses give you the theory; the 89 practice questions for the SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing (C_TS422_2504 Deutsch Version) give you the rehearsal — every answer expert-verified.
The SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing (C_TS422_2504 Deutsch Version) is SAP's certification exam for SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing, at the Associate level. It validates job-ready skills, and passing it marks you as a verified professional. Related credentials include SAP S/4HANA Cloud Private Edition - Production Planning (PP), SAP S/4HANA Cloud Private Edition - Manufacturing.
USD 200 per attempt, 68% to pass. A retake costs the full fee again — effective preparation with the 89 practice questions for the C_TS422_2504 Deutsch exam is the economical path.
SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing (C_TS422_2504 Deutsch Version) Sample Questions:
Was ist eine Arbeitsplatzhierarchie?
- A. Eine Gruppe alternativer Arbeitszentren, die eine kumulierte verfügbare Produktionskapazität bereitstellen.
- B. Eine Gruppe von Arbeitszentren in einer Produktionslinie, die nacheinander für die Produktion verwendet werden
- C. Eine Gruppe alternativer Produktionsarbeitsplätze, die hierarchisch nach Prioritäten strukturiert sind.
- D. Eine Gruppe von Arbeitsplätzen in paralleler Anordnung, die dazu dient, Produktionsmengen aufzuteilen und parallel an ihnen zu arbeiten
Correct Answer: A 🗳️
Wann löst das System die Nachfüllung eines Kanban-Containers aus?
- A. Wenn Sie den Container auf Warten setzen
- B. Wenn Sie den Container auf „Leer“ setzen.
- C. Wenn Sie den Container auf Vollständig einstellen.
- D. Wenn Sie den Container auf „Unterwegs“ setzen.
Correct Answer: B 🗳️
Welche Operationen werden in der Kapazitätsplanungstabelle berücksichtigt?
Hinweis: Es gibt 2 richtige Antworten auf diese Frage.
- A. Alle Operationen
- B. Unteroperationen
- C. Nur Engpassoperationen
- D. Operationen, die einem Herzschrittmacher-Arbeitszentrum zugeordnet sind
Correct Answer: B,C 🗳️
Sie sind Berater in einem SAP S/4HANA Cloud Greenfield-Projekt.
Auf welche der folgenden Aspekte sollten Sie sich konzentrieren, um eine hohe Qualität der Kerndaten zu gewährleisten? Hinweis: Es gibt 2 richtige Antworten auf diese Frage.
- A. Effizienz
- B. Genauigkeit
- C. Aktualität
- D. Stabilität
Correct Answer: A,D 🗳️
Was passiert, wenn Sie die detaillierte Terminplanung mit dem Modus „Einfügevorgang“ für die endliche Terminplanung einrichten? Hinweis: Es gibt 2 richtige Antworten auf diese Frage.
- A. Änderungen werden automatisch in der gesamten Sammelbestellung umgesetzt.
- B. Benachbarte Operationen können in beide Richtungen verschoben werden, um einen Slot zu erzeugen.
- C. Die Planung eines Vorgangs erfolgt so nah wie möglich am gewünschten Termin.
- D. Die Reihenfolge der Multiaktivitätsressourcen wird automatisch aktualisiert.
Correct Answer: A,C 🗳️
Free Demo






